
REFRIGERATED GOODS
The right conditions.
Across every handover.
Required temperature, equipment and handover conditions reviewed for the route. Connect supplier pickup, freight, documents and final delivery around your cargo.
THE PRODUCT SHAPES THE PLAN
A temperature setting
is only the beginning.
A refrigerated shipment is a chain of conditions, not only a container setting. Define the product's range, loading condition and airflow needs, then plan power, monitoring and receiving capacity across the full route, including time spent waiting between movements.

BEFORE THE FIRST HANDOVER
Make the details clear.
Before pickup.
- 01
Product instructions
Confirm the required range, loading temperature, ventilation and humidity instructions where relevant, along with the person authorised to assess any condition deviation.
- 02
Equipment and continuity
Check suitable equipment, power arrangements and transfer points, with an agreed response if a connection, loading slot or delivery appointment changes.
- 03
Monitoring and receipt
Agree what will be recorded, where monitoring devices are placed and how the receiving team will review the data and unload promptly.
THE PLAN, MADE PRACTICAL
Define. Monitor.
Review at receipt.
Three connected stages, shaped around refrigerated goods and the people handling the shipment.
Set the product conditions
Collect the shipper's handling instructions and define the full route, including dwell time. Agree monitoring, escalation contacts and the receiving storage arrangements before equipment is allocated.
Load and maintain airflow
Check loading condition and the specified equipment settings. Arrange cargo according to the equipment and product instructions, preserving airflow and recording seals and handover details before departure.
Review the temperature record
Bring the transport record to the receiving team with the cargo. Flag excursions or missing readings for the responsible quality assessment before affected goods enter usable stock.
SHIPPING REQUIREMENTS
The right checks.
For this cargo.
Review the product, origin, destination and transport mode together before committing to a shipment.
Use the official sources alongside the product instructions. Confirm the current requirements for the exact goods and countries involved.01Temperature and equipment scopeRoute-specific requirements
Some international road and rail movements of perishable food fall under the ATP agreement, with equipment and temperature conditions defined by its scope. Check whether the actual route and product are covered. Use the shipper's requirements and applicable local rules for the complete journey, including other transport modes.
02Food hygiene and conditionProduct-specific review
For refrigerated food, the relevant hygiene controls extend through loading, transport and unloading. Define cleaning, separation and condition checks around the food itself. Medicines and other temperature-sensitive products need their own quality and regulatory assessment; a food reefer plan should not automatically be reused for those goods.
WHEN SOMETHING NEEDS ATTENTION
Temperature deviation under review
The monitoring record shows time outside the agreed range during a transfer. The affected lot is identified and the quality owner receives the duration, readings and handling details. Release waits for that assessment rather than following automatically when the temperature returns to normal.

BEFORE YOU SHIP
A few practical answers.
Common questions about refrigerated goods, from preparation to receiving.
Does the set point prove the cargo stayed in range?
Can a reefer fix a warm or otherwise unsuitable load?
YOUR NEXT SHIPMENT
Let’s plan around your cargo.
Share the product, the route and the conditions it needs.