AI powered end-to-end logistics platform.See what we handle
Two workers wearing protective equipment inspect rolled steel in a factory.

STEEL

Coils, sheets and sections.
Every tonne planned.

Weight distribution, dimensions and handling equipment considered in the plan. Connect supplier pickup, freight, documents and final delivery around your cargo.

Coils · sheets · fabricated steel productsIndustry photography & credits

THE PRODUCT SHAPES THE PLAN

Weight and geometry
shape the whole journey.

Steel shipments combine high unit weights with surfaces and grades that need careful identification. Coils, sheets and fabricated sections each call for suitable support, securing and lifting, with heat or batch references carried through to the receiving mill or site.

Coilssheetsfabricated steel products
Close-up of precision metalworking machinery in an industrial workshop.
Coils · sheets · fabricated steel products. Plan the handling around the product.

BEFORE THE FIRST HANDOVER

Make the details clear.
Before pickup.

  1. 01

    Grade and traceability

    Match the steel grade, dimensions and heat or batch references to the order and agreed material certificates before preparing the shipping documents.

  2. 02

    Weight distribution

    Confirm individual piece weights, support points and loading limits so the chosen transport unit and securing plan suit concentrated loads such as coils.

  3. 03

    Surface protection

    Agree protection for edges, coatings and finished surfaces, and record existing condition before loading so later observations can be assessed against a baseline.

THE PLAN, MADE PRACTICAL

Identify the steel.
Secure the movement.

Three connected stages, shaped around steel and the people handling the shipment.

  1. Match grade and heat

    Reconcile product dimensions, grade and heat or batch numbers with the order. Link material evidence to the marked coils, bundles or sections before assigning them to a shipment.

  2. Support and secure

    Prepare the loading arrangement around piece weights and the product's shape. Confirm appropriate support, securing and handling equipment, then capture condition and package identification before departure.

  3. Inspect the receiving load

    Check package marks and visible condition during unloading. Record wetting, coating damage or distorted edges, keeping the affected material identifiable for the buyer's assessment before acceptance.

SHIPPING REQUIREMENTS

The right checks.
For this cargo.

Review the product, origin, destination and transport mode together before committing to a shipment.

Use the official sources alongside the product instructions. Confirm the current requirements for the exact goods and countries involved.
01Steel quality-control scopeIndia product requirements

The Ministry of Steel publishes quality-control requirements for covered steel products. Check the current order against the precise grade, product form and standard, together with any applicable conditions or exemptions. Match documentary evidence to the actual producer and material rather than relying on a generic steel certificate.

02Securing heavy cargoLoading plan

Cargo securing guidance addresses the risks created by unsuitable stowage and restraint. Have the responsible packer or specialist establish a plan for the actual coil, sheet or section weights. Confirm equipment limitations and unloading arrangements before loading; fitting the cargo inside a container does not establish a suitable plan.

BEFORE YOU SHIP

A few practical answers.

Common questions about steel, from preparation to receiving.

Can coils and flat products use the same packing plan?
Not automatically. Their shape, support needs and concentrated loads differ. Provide piece weights and dimensions so the responsible loading team can select suitable equipment, supports and restraint for each product.
Why keep heat numbers with the shipment?
Where the order uses heat or batch traceability, those identifiers connect the delivered material to its agreed evidence. Keep markings legible and reconcile them before receipt so similar-looking grades are not mixed.

YOUR NEXT SHIPMENT

Let’s plan around your cargo.

Share the product, the route and the conditions it needs.

Start your shipment