
SCIENCE & TECHNOLOGY
Sensitive instruments.
A precisely planned move.
Specifications and handling details carried through each shipment handover. Connect supplier pickup, freight, documents and final delivery around your cargo.
THE PRODUCT SHAPES THE PLAN
Start with the instrument.
Plan every handover.
Scientific equipment often travels with accessories, calibration records and setup requirements that matter as much as the main instrument. Connect its technical specification and sensitivity to protective packing, any export-control review and a prepared receiving laboratory.

BEFORE THE FIRST HANDOVER
Make the details clear.
Before pickup.
- 01
Instrument and accessories
Record the model, serial number and complete accessory list, with technical specifications and any calibration or service records the receiving laboratory expects.
- 02
Transport sensitivity
Confirm shock, tilt, moisture and temperature instructions, including manufacturer transport locks or preparation steps required before the instrument can leave the laboratory or factory.
- 03
Use and receiving setup
Clarify the destination, end user and intended use, then agree unloading, unpacking and any specialist installation or recommissioning arrangements with the receiving team.
THE PLAN, MADE PRACTICAL
Review. Stabilise.
Receive with a record.
Three connected stages, shaped around science & technology and the people handling the shipment.
Define the instrument shipment
Bring technical specifications, serial numbers and accessories into the shipping record. Confirm intended use and any applicable control review while the manufacturer can still clarify the equipment's capabilities.
Prepare for movement
Follow the manufacturer's transport preparation and packing instructions. Check locks, supported components and monitoring needs, then record the complete packed condition and package list before collection is arranged.
Handover to the laboratory
Reconcile the instrument and accessories with the receiving record. Review any handling indicators or visible damage, and leave unpacking, calibration or recommissioning decisions to the responsible technical team.
SHIPPING REQUIREMENTS
The right checks.
For this cargo.
Review the product, origin, destination and transport mode together before committing to a shipment.
Use the official sources alongside the product instructions. Confirm the current requirements for the exact goods and countries involved.01Technical export-control reviewIndia exports
Some equipment and technology may fall within SCOMET controls based on technical characteristics and the transaction. Provide accurate specifications and end-use information for a competent assessment before export. A description such as laboratory equipment is too broad to establish whether an authorisation or other condition applies.
02Separate special cargoInstrument contents
An instrument shipment can include batteries, chemicals or other items needing their own transport classification. Identify them separately and obtain the appropriate modal review before packing. Do not assume that describing these items as accessories removes their handling requirements or makes them suitable for the same booking.
WHEN SOMETHING NEEDS ATTENTION
Transport preparation is incomplete
The packing record does not confirm that a sensitive moving component has been secured. Collection pauses while the manufacturer or authorised technical team checks the preparation. Their confirmation and updated packing record are shared before the instrument is released for movement.

BEFORE YOU SHIP
A few practical answers.
Common questions about science & technology, from preparation to receiving.
Does the original crate guarantee the instrument is ready to move?
Can reagents or samples travel with the equipment?
YOUR NEXT SHIPMENT
Let’s plan around your cargo.
Share the product, the route and the conditions it needs.